U.S. Bank Home Mortgage
Delivery and Funding
CDA Requirements
Top Exceptions
Help Desk and Lender Reference
203(ks)
Customer Service and Loss Mitigation
Underwriting Highlights and Resources
Q & A
Agenda
U.S. Bank Home Mortgage
Review, purchase, securitize, and service mortgage
loans from all participating lenders who are
approved to originate in a program.
Loans must meet compliance requirements and
loan product underwriting guidelines, as well as
any U.S. Bank guidelines.
Delivery & Funding
Access information at: www.mrbp.usbank.com
Click on U.S. Bank lender manuals and “continue”
to Allregs
Review Delivery and Funding Guidelines,
Checklists, Forms, and any Updates
Share information with Originators, Closers &
Shippers
Select U.S. Bank Lending Manuals
Continue to Access Allregs
Open Housing Finance Authority folder
and select Maryland
Delivery & Funding
Program Information
Example
Checklist
Other Resources
Electronic Signatures on Initial
Disclosures
Upfront disclosures are eligible to be delivered and signed
electronically such as:
Initial application (1003)
Initial TIL & Initial GFE
Affiliated Business Disclosure & Transfer of Servicing Disclosure
Any product specific disclosures required at application, i.e. ARM,
LPMI, etc.
Any state-specific disclosures required at application or other disclosures
required at application
See Bulletin 2013-30 for more details
High Priced vs. High Cost Loans
U.S. Bank may purchase a High Priced Mortgage Loan (HPML)
High Priced is based on the interest rate and APR
U.S. Bank will not purchase a High Cost mortgage
High Cost is based on excessive fees in the loan transaction
See Bulletin 2009-69
Streamlined 203K
Lender Approval
All lenders wishing to participate in the 203(ks) program
must go through a separate 203(ks) approval process.
To be approved, lenders must have originated at least 50 203(k)
loans in the past two years.
Approval process will include performance analysis of previous
203(k) loans originated by lender.
Note: U.S. Bank only accepts streamlined 203(k) referred to as
203(ks) loans. Standard 203(k) loans are not permitted.
Streamlined 203(k) Overview
Lenders must review the
203(ks) manual on U.S.
Bank website:
www.mrbp.usbank.com /U.S. Bank
Lending Manuals/203(ks) manual All
States/General Requirements
Please also review our
203(ks) presentation at:
http://www.brainshark.com/brainshar
k/brainshark.net/portal/title.aspx?pid=
zFDz5M13hz47vMz0
U.S. Bank 203(ks) Manual and Forms:
www.mrbp.usbank.com
MRBP 203(ks) Administration:
Debbie Tron 270-689-7580
Alisa Shively 270-689-7766
Bonnie Hoffman 270-689-7545
Sharon Frazier 270-689-7749
FHA:
http://www.hud.gov/offices/hsg/sfh/203k/203kmenu.cfm
203(ks) Reference
Lender Guide
Insurance Deductibles
Hazard / Flood /all other perils Government Loans
Deductibles may not exceed the higher of $2,500 or 2.5 % of the face amount of the
policy.
Association Policy requirements for CONDO/PUD Projects and common areas.
Deductibles may not exceed the higher of $2,500 or 2.5% of the policy’s insurance limits
for all covered losses. U.S. Bank requires an HO-6 (walls-in) policy on all condo units.
Conventional Loans
Deductibles cannot exceed 5% of the face amount of the policy for hazard and $5,000 for
flood. The maximum deductible on a flood policy for condo/PUD project and co-ops may
not exceed $25,000.
Provide proof via paid receipt for all policies to show one year advance payment. Include the
dollar amount paid.
The insurance agent is required to have an A. M. Best Company Key Rating Guide of Class VIII/A,
non assessable company with a Demotech A rating or a Financial Performance Rating (FPR)
of 6 or better.
Hazard Insurance / Loss
Payee Clause:
U.S. Bank National Association
its successors and or assigns as their interest
may appear.
c/o U.S. Bank Home Mortgage
P.O. Box 7298
Springfield, OH 45501-7298
Endorsements / Assignments
U.S. Bank National Association” (First Mortgages)
Reference
CDA Program Requirements
All loans must be originated in accordance with FHA, VA,
Fannie/Freddie, or RHS guidelines, including the following
additional guidelines:
Minimum mid credit score of 640 required for all loans.
Max 45% Ratio on AUS, max 36% on manual, but can go
up to 45% with compensating factors.
All government loans (FHA/VA/RHS) sold to U.S. Bank
must be insured within sixty (60) days from the settlement
date on the HUD-1 Settlement Statement.
CDA Requirements - Property Rights
Property Rights should be consistent on:
Warranty Deed
1st Mortgage Deed of Trust
2nd Mortgage DSELP Deed of Trust
Appraisal Title Binder, Policy (short form is acceptable too)
If property is Leasehold- lender is required to escrow
Ground Rent (no exceptions)
If Ground Rent owner is unknown you must collect 3 years
of Ground Rent at time of closing on HUD-1
Ground Rent Redemption
If the ground rent was redeemed at closing, please
ensure all corresponding documentation reflects
fee simple vs. leasehold:
Examples: Deed listing property as fee simple, title
policy listing property as fee simple and title
commitment stating that ground rent was redeemed at
closing, Deed of Trust not listing a ground rent, notation
of an expense related to a ground rent redemption listed
on the HUD-1, etc.
CDA Requirements
USB will review line 802 of the HUD1 to verify no points
were collected. If there were, we will notify the lender to
refund to the borrower and give us the evidence prior to
loan purchase
CDA DSELP or SPIF loan required to be listed on
Schedule B of title binder or commitment
Must be in second position unless approved by CDA
CDA Requirements - Ownership
Single person—SOLE OWNER (can be listed just as borrower’s name—does not
have to reflect “sole owner.”)
Husband and wifeTENANTS BY THE ENTIRETY. This form of ownership
can be stated in one of the following ways:
John Doe and Mary Doe, his wife
John Doe and Mary Doe, husband and wife
John Doe and Mary Doe, tenants by the entirety
John Doe and Mary Doe, married
Unmarried persons or three or more personsmust state JOINT TENANTS.
Tenants in Common is NOT allowed under the CDA program
Ownership is required to be held the same on the below documents:
Application 1003 form
Warranty Deed
DOT 1
st
& 2
nd
mortgages
Title Commitment/Policy
Home Inspection Certification
A Home Inspection
Certification is
required for all loans
with the exception
of new construction
and refinance loans.
Available at
mrbp.usbank.com
USB 002
All documents are to be organized in a legal-
sized folder according to the Loan Delivery
Checklist
Mailing address for all files and original
conditions:
U.S. Bank Home Mortgage
Attn: Operations Department
17500 Rockside Road
Bedford, OH 44146
Closed Loan Delivery to U.S. Bank
Loan Processing Turn Times
The average review time for closed loans delivered for
purchase is between 3 and 5 business days from the
day of receipt by U.S. Bank
Complete, compliance approved loans will be
approved for purchase
Incomplete loans will be suspended and lenders will
receive a suspense letter
Exceptions received are generally cleared with 24
hours
Loans are generally funded within 1 to 2 business days
from the day the last exception item is cleared
Most Frequent Document Exceptions
CDA specific
Missing notice of assignment disclosures
Leasehold and fee simple ownership
documentation that is not consistent across the
file documents
Missing ground rent on first payment letters in
leasehold scenarios
Marital status agreement errors across the
documentation
Missing second notes
Hazard deductibles that exceed USB limits
Incomplete second DOT certification sections
Most Frequent Document Exceptions
CDA specific
Title commitments that do not reflect the DSELP/SPIF
MDIA - missing corrective TILs
MDIA - early TIL timing errors
RESPA - Monthly payment amount increased without
a revised GFE
Missing MBS Compliance Certificates
Address inconsistencies throughout the file
Second notes that do not show the DSELP box
checked reflecting the DSELP loan
HUD 92900A forms that are not completed and signed
by all parties
Real Estate Settlement Procedures Act
(RESPA)
U.S. Bank’s File Review
U.S. Bank Home Mortgage-MRBP staff performs a basic compliance review of the GFE
document to ensure compliance with the following:
Ensure GFE is on proper form
Ensure HUD-1 is on proper form
Verify “Loan Terms” on HUD-1 match “Summary of Your Loan” on the last issued GFE
Verify HUD-1 is within acceptable tolerances with last GFE issued including a review of
charges that cannot increase by more than 10%
Verify lender provided acceptable cure documentation, if applicable
Post Settlement Cure: HUD allow lenders a 30-day cure period from date of borrowers
signed closing documents for violating GFE/HUD-1 fee tolerances. Lenders exceeding fee
tolerances will be in violation of Section 5 of RESPA. USBHM must receive proof of refund
to borrower and a corrected HUD-1, from settlement agent prior to loan purchase.
NOTE: If there is a known issue, don’t wait until USBHM has reviewed as you may
exceed the 30-day cure period for correction.
Bulletin 2009-40
Mortgage Disclosure Improvement Act
Bulletin 2009-40 Page 2
RESPA Reference:
http://www.hud.gov/offices/hsg/rmra/res/respa_hm.cfm
Loans With Exceptions
U.S. Bank will communicate all loan exceptions to a
designated person via daily fax and weekly recap report
Exceptions can be emailed to
mrbp.exceptions@usbank.com
Please provide separate cover letter/sheet for each loan
exception and include U.S. Bank loan number
Once all outstanding deficiencies have been resolved and
loan has been compliance approved, U.S. Bank will
purchase the loan
Loan Purchase Process
Loans are purchased daily once all closed loan file exceptions
and compliance exceptions have been cleared and CDA has
given final compliance approval to U.S. Bank
Loans will be funded at an amortized balance net of escrow
funds (no checks). No escrow cushion required
Purchased loan summary / detail is faxed to lenders
U.S. BANK Fees:
Funding Fee - $250 (net out at purchase)
Tax Service Fee - $85 (net out at purchase)
Funds to Lender at Purchase:
Applicable lender compensation per CDA directives
Lender Help Desk
E-Mail the Help Desk
Status of loans
Status of documents received
Loan Deficiencies / Exceptions
Program guidelines
General information
Help Desk Line:
1-800-562-5165
Post-Purchase - Final Documents
Organize documents according to checklist
All lenders are responsible for delivery of documents
to U.S. Bank
Due within 120 days from purchase by U.S. Bank
A late fee of $50 will be assessed after 120 days
Deliver to: U.S. Bank Home Mortgage
Attn: Document Control
17500 Rockside Road
Bedford, Ohio 44146-2099
Title Policy:
Mortgage amount is missing
Schedule A, item 4 contains incorrect deed of trust recording information
Name of insured is incomplete (needs to mirror deed of trust and have “it’s successors
and/or assigns”)
Missing required endorsements
Deed of Trust:
Closing date is incomplete
Missing marital status of borrower(s)
Incorrect maturity date
Legal description missing
Riders are recorded with second deed of trust instead of the first deed of trust
Assignments:
Missing all recordings of the deed of trust
Post-Close Trailing Doc Exceptions
Customer Service Toll Free Number
800-240-7890
Hours: Monday Friday
7:00 am 8:00 pm EST
www.usbankhomemortgage.com
Customer Service
Borrower Payment
Address and website:
U.S. Bank Home Mortgage
P.O. Box 468002
Bedford, OH 44146-8002
www.usbankhomemortgage.com
Customer Service
Borrowers receive monthly billing statements
Spanish Speaking Customer Service & Default
Representatives
Interactive Voice Response System (24 hours a day)
Mortgagor Website Access (24 / 7)
www.usbankhomemortgage.com
Call Center Operations M-F (7:00am 8:00pm est.) 800-
240-7890
Default Servicing Call Center Operations (8:00am
8:00pm est.)
Flexible Payment Methods: ACH, Mail,
Website, Phone
Underwriting Highlights
This presentation is for basic informational purposes
only. It does not modify or replace the information
provided by FHA, VA, RD, Fannie Mae or Freddie
Mac. All loans should be underwritten in compliance
with the most current underwriting guidelines
It is the lender’s responsibility to follow all guidelines
specific to the program as well as any U.S. Bank
guidelines including mortgagee letters,
announcements, or bulletins. This presentation is for
general products requirements
U.S. Bank and CDA do not re-underwrite loans and
are not liable for loans not meeting product guideline
criteria
Underwriting Highlights - Conventional
For Conventional loans, choose “HFA Preferred” in DU or run as
a Home Possible in LP
DU result must be “approve/eligible” and LP result must be
“accept”
No LLPA or adverse fee collected on HFA Preferred loans.
Manual underwrites (not allowed on Home Possible)
Follow Fannie’s guidelines for an MCM loan (eligibility matrix).
Please ensure that the most recent guidelines are followed:
efanniemae.com
Maximum AMI limit is the greater of: the limits per the Fannie
Mae selling guide or the limits established by CDA
SFC of 358 must be added to 1008
The following automated systems are approved for
use with loans in the bond programs
FHA, VA, and Conventional loans (DU or
LP)
RD Loans (GUS)
Other lender customized automated underwriting
systems are not acceptable at this time
Underwriting Systems
Resources
FHA Underwriting Guidelines
Guide 4155.1 rev 5
FHA website www.hud.gov
Allregs www.allregs.com
Search answers.hud.gov
Phone Monday-Friday, 8 am to 8 pm ET
1-800-CALLFHA (1-800-225-5342)
Additional Resources
Fannie Mae References
www.efanniemae.com
Other References
VA: www.homeloans.va.gov
USDA-RD: www.rurdev.usda.gov
For your participation
in the
Maryland CDA
program!
THANK YOU